Power News
Power Today |
 
Advertise Here [728 W x 90 H pixels]
Label
Result(s) found: 3
O&M can account for 25 per cent of the project´s life expense
February 2016
The variables involved in the O&M for wind power projects are the wind turbine technology, size and location of wind farm and the O&M philosophy adopted, which can be either reactive, preventive or condition based maintenance.
Greasing the Wheels
February 2016
Inadequate O&M can lead to minor faults or defects not being recognised. This not only impacts yield but can also result in major component failure, potentially leading to costly repairs and lengthy downtime.
Spain´s Gamesa signs 100 MW windpower project in Maharashtra
February 2015
Spain-based wind turbine maker Gamesa has bagged a 100 MW wind power project in Maharashtra from Orange Renewable Power.
1 
 

Cool Math Games For Kids Cool Math Games Online Lyrics For Song Useful Tips For Small SEO Cool MathGames Interview Questions Answers Learn English Free Hindi Dictionary Used Cars In India Fresh Jobs In India Fresh Property In India On Road Price In India
Advertise Here [728 W x 90 H pixels]