The Long Shot
Wind energy has been identified as a potential response to India´s crucial power challenges since the 1990s. The sector has undergone a major shift in India, and even after a good 25 years, we still await the full potential of this renewable source to be realised.
Wind Energy, IPP, Eco-Systems, Mytrah Energy, Tulsi Tanti, Suzlon Group, Solar PV Cells, Wind, Solar, Renewable Technologies, Technology Evolution, Fibreglass, CFD, Lcoe, NPA
|
The Indian power sector has been advancing on the technological front
India at present is more dependent on fossil fuels to power its fast growing economy. Compared to developed nations India has not fully explored its hydro power potential and its share in the generation mix is very less when compared to other conventional sources.
Tomohiko Okada, Toshiba India Pvt. Ltd, Goi, Renewable Energy, Hydro Power, Electro-Mechanical Equipment, Machineries, CFD, GIS, PPA, SHP Projects, Koldam Project
|
Reduction of auxiliary power consumption using CFD techniques
In a thermal power plant, hot flue gases along with ash containing quartz and mullite (abrasive) particles leave through the Economizer (ECO) outlet, pass through the Regenerative Air Pre-heater (RAPH), flue gas duct, Electrostatic Precipitator (ESP), Induced Draught (ID) Fan and Stack.
Thermal Power Plant, Economizer, RAPH, Electrostatic Precipitator, Induced Draught, CFD Technique, Jindal Power Ltd, Ansys Work, ANSYS ICEM, ESP, R&D Center, Mechwell Industries
|
Minimising emissions during VCM tank commissioning
Commissioning can be done in a controlled manner to restrict emission rate in conventional production plants, but commissioning in refrigerated unloading or storage terminal handling cargo like Vinyl chloride monomer (VCM) can be done only on ship arrival for gassing up and chill down
VCM, Compressors, Liquid VCM, Pipe, Cooling Water Condensers, Drying, Tank First Filling, CFD, Spargers, PVC, LEL, UEL, A Mohan, S Rajan, TNV Satynarayana
|