Power News
Power Today |
 
Advertise Here [728 W x 90 H pixels]
Label
Result(s) found: 9
"The wind sector turnaround will start in 2019-20"
October 2018
In an interview, DV Giri, Secretary General, Wind Turbine Manufacturers Association said that in 2018-19 with the dependence on the SECI bids that have an 18 months project period, and bids from Tamil Nadu, Gujarat and Maharashtra will see the installation of around 2,000-2,500 MW in FY19, further adding that the turnaround will start from 2019-20 and the future is good for the industry.
We need strong transmission lines for wind
August 2018
The policy from the beginning has articulated that there will be unwind or sunset of all the subsidy elements. And, that has been consistent. Some of them were given sunset in the last budget, while some have continued.
Gearing up for 80 GW and beyond
August 2018
Wind dominates the renewable energy (RE) segment with an installed capacity of over 34,000 MW. The segment, which was once the leader in RE, may lose its sheen as grid-connected solar energy may take over wind in the coming years
Financial institutes cast doubts on the viability of projects
August 2018
The target is achievable if you look at the wind potential and the capabilities of the wind turbine manufacturers, who can manufacture the machines and develop the workforce to execute the project. If you take that as a benchmark, then it is achievable.
India's first wind tender oversubscribed despite off-take uncertainties | BTI
February 2017
Earlier this month, SECI received bids for India’s first wind power tender. There are two unique aspects of this tender – i) successful bidders will sign 25-PPAs with PTC India Limited, which will sign back-to-back PPAs with as yet unknown discoms; and ii) existing operational projects and/or under construction projects are eligible to participate.
Realising the potential
June 2016
With truckloads of untreated waste being generated daily, while the country is struggling to achieve consistent power supply to all, waste-to-energy seems to be a bright proposition. However, awareness and implementation remain major constraints.
We require growth in the intra and inter-state electricity grids
September 2015
The RE sector has grown at over 10 per cent per annum over the last two years, driven majorly by the wind sector accounting for 4,300 MW new installations, followed by solar installations of around 1,900 MW in the same period.
Wind has added 70% of the total capacity
September 2011
The company, at the time of going to press, proposed to construct an AUS $1.3 billion wind farm and integrated renewable energy project on South Australia's Yorke Peninsula to deliver power to 225,000 homes every year.
Wind has added 70% of the total capacity
September 2011
The company, at the time of going to press, proposed to construct an AUS $1.3 billion wind farm and integrated renewable energy project on South Australia's Yorke Peninsula to deliver power to 225,000 homes every year.
1 
 

Cool Math Games For Kids Cool Math Games Online Lyrics For Song Useful Tips For Small SEO Cool MathGames Interview Questions Answers Learn English Free Hindi Dictionary Used Cars In India Fresh Jobs In India Fresh Property In India On Road Price In India
Advertise Here [728 W x 90 H pixels]